![]() |
| Cockpit fairing completed, and new companionway doors and cover started. Rob is an artist. Cover will be hinged on the port side and can be slid off the hinges and stowed below. |
Built in 1965 by Russell Marine in the U.K. Trailored and sailed across the mainland U.S. to her new home in Port Townsend, Washington. Across the water from Victoria, B.C, South of the San Juan Islands and West of Whidbey Island, WA. Launched Yasmin with a chinese junk rig, with a new forward raked unstayed mast and a bamboo battened 200 square foot sail... ( Goblin has been renamed Yasmin for her first sailing on September 1, 2012)
Showing posts with label fairing. Show all posts
Showing posts with label fairing. Show all posts
Monday, April 2, 2012
Fairing completed on all decks and cockpit..
Sunday, January 22, 2012
End of week 3 in pictures, first coat of paint on the hull!
![]() |
| A full rainbow shows during a brief break in the storm banging down on downtown Port Townsend 1/22/2012 |
First coat starts at the transom and continues until just past the viewing angle of this photo... as a bit of motivation.Rob shows me how to epoxy/glass the pockets he just ground out of the starboard keel.


Above, you can see the new stiffening bulkhead, connecting the aft of each keel to the sides of the hull. This can be cut down when we're ready to re-install the berths. (next year?)
1) the mast, cutting down a douglas fir tree next to my house and will dry it out here in the shop.
2) Mast step
3) Mast partners through the deck.
4) Mast opening
5) epoxy paint on repaired keels.
WooHoo!
Subscribe to:
Posts (Atom)








